1Toro’s new INFINITY Series sprinklers with SMART ACCESS™ are designed specically for Golf applications and extend and enhance Toro’s industry lead
10To Replace the Pilot Valve Solenoid ere are two Step 1s, depending on which version of the INFINITY Series sprinkler is being serviced.1With Intel
11To Remove the Sprinkler Riser Assembly1Insert the multipurpose tool into slot of riser cap. Tilt tool back to lock it in.2Pull up riser and grasp
12For INF34 and INF54 Sprinklers (Full Circle only)Refer to Figure 8 for the following procedure.1. Grasp return spring (14) and riser (16) rmly and
13To Install the INF35 and INF55 Sprinkler Riser Assemblies1Insert the “hold up” tool into nozzle notch and riser spring collar.2Note locations of ali
14To Service the Main Valve and Rock Screen! WARNING: To service the main valve, the water supply to sprinkler must be shut o and any residual water
15To Reinstall Main ValveUse the valve insertion tool. ere are two sizes of the tool depending on the size of the sprinkler inlet. • 118-1843 is the
16Flushing the Sprinkler1. With sprinkler operating, carefully step down on center of cap several times. Water will ow around riser and ush out deb
2ACME read Notes e ACME thread golf sprinkler body requires an ACME thread swing joint for connection to the piping system. e ACME swing joint has
3Unpacking the Sprinkler1Remove the retaining screw.2Lift the cover.3Remove accessory kit.Waterproof Wire Splices! CAUTION: All wire splices and eld
4Sprinkler Wiring ConnectionsConnecting Communication Cable to the INFINITY Series with GDC Modulee GDC system provides a coded DC signal over a pola
5Connecting Control Wires to the INFINITY Series with Satellitee eld satellite controllers provide a 24 VAC signal to the sprinklers typically using
6Table 1: Recommended System Fill RatePipe Size Flow Velocity Pipe Size Flow Velocityinch cm GPM LPM ft/sec m/sec inch cm GPM LPM ft/sec m/sec1/2 1.3
7Servicee INFINITY Series sprinklers are designed to provide the user trouble-free operation for many years without scheduled maintenance. If it beco
8To Service the GDC Modulee GDC module has wires running directly to the solenoid. Replacement requires cutting and splicing wires. Use water-proof
9To Service the Pilot Valvee pilot valve can be replaced while the system is under pressure. Remove the pilot valve for service. Refer to Figure 1 f
Comments to this Manuals