Specifications:• Controls up to 200 stations for the Stand-Alone model• Input power supply100 VAC, 50/60Hz120 VAC, 50/60Hz240 VAC, 50/60Hz• GDC output
Earth Ground InstallationIMPORTANT! The GDC surge protection components cannot properly function unless an efficient pathway to earthground is provide
Power Source InstallationStep 1 – Turn off the power at the power source location andplace the controller’s power switch to OFF. Connect androute the
Station Decoder InstallationThe station decoder module is available in 1-station, 2-station or 4-station configuration. The decoder modules are instal
Paths – 1234Valve BoxMaximum communication wire length between the controller and the farthest decoder is 15,000ft (4500m).Recommended Cable for Cont
Grounding Communication CableIMPORTANT! Cable Splices: In order for the wire connections to comply with the 2005 edition of the NationalElectric Code®
Master Valve / Pump Relay InstallationGDC provide switch terminals to control a master valve or a pump relay if the system requires it. Step 1 – Place
Lithium Battery ReplacementA 3.9V Lithium battery (P/N 363-2200) is installed in the timing mechanism to sustain the controller’s clock time and date
Comments to this Manuals