Toro Network VP Satellite Series User Manual Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
7. Press the Down Arrow to advance the cursor to the Delay: field. This delay time will determine the
wait time between program cycles. Use the Input Dial to select the delay time value. Use the Left
and Right Arrow Keys to navigate between the Hours and Minutes fields. For this example, set the
delay time to 02:15.
8. Press the Down Arrow to advance the cursor to the Sta#: field. Use the Input Dial to
select the correct value of the first station being irrigated. For this example, select station 21.
9. Press the Right Arrow to advance the cursor to the next value. This value will indicate the last station of
the range. If irrigating only one station, this value should be the same as the first value. For this example,
select station 30.
10. Press the Right Arrow to advance the cursor to the next entry field. This entry field will indicate the
runtime in hours, minutes and seconds (HH:MM:SS). Use the Input Dial and the Right Arrow Key
to select the appropriate runtime value. For this example, set the runtime to 00:05:00.
11. Press the Down Arrow to advance the cursor to the Simult: field. Use the Input Dial to
select the maximum allowable simultaneous active station. For this example, set the value to 05.
When finished, the display should read:
P 03 100% 00:50:00
Hold: None
Type: Grow In
Start: 06:30am
End: 04:00pm
Delay: 02:15 (hr:min)
Sta#: 21–30 00:05:00
Sta#: – – – – – – : – – : – –
Simult: 05
GMM (Group Multi-Manual) Setting:
GMM example: Create Group Multi-Manual with two sequences. Sequence 1 will have stations 1, 5, 7 and 9 with
a runtime of 15 minutes per station. Sequence 2 will have stations 2, 3, 4, 11, 12 and 13 with a runtime of 20
minutes per station. The GMM will have two start times, one at 9pm and the other at 3am. GMM shall run only on
Sundays, Tuesdays, Thursdays and Saturdays.
1. Press the Scheduled Watering Key . The cursor is initially located at the program selection field. Use the
Input Dial to select GMM which is located between P64 and P01.
2. Press the Down Arrow to advance to the Set – Act days field. This field allows you to select the
days of the week the GMM will activate. Use the Right and Left arrows to navigate between days
of the week and use the Input Dial to activate/deactivate a day. All days are deactivated as the
factory default. To activate Sunday, Tuesday, Thursday and Saturday, place an X under its corresponding
initial.
3. Press the Down Arrow to advance to the Start: field. Use the Right and Left arrows to
navigate to the start number and time. Use the Input Dial to select the Start number and enter the
start time. Set Start time 01 to 09:00pm and Start time 02 to 03:00am.
4. Press the Down Arrow to advance to the Seq#: field. Use the Right and Left arrows to
navigate between the Sequence number and runtimes. Use the Input Dial to select the sequence
number and set sequence station runtimes. Set Sequence 01 to 00:15:00 of runtime.
(Continued to the next page)
20
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Comments to this Manuals

No comments